Javascript must be enabled to use this form.

 
 
 
HOME
NEWS
ABOUT US
SERVICES
PROJECTS
CAREERS
SUPPLIER
CSR
INQUIRIES
 
First Balfour, Inc. Home
Title:  Category:  Status:   
FOUND: 25 RECORD(S) ON 2 PAGE(S). DISPLAYED: RECORD(S) 1 TO 15.

Construction of New 111ML San Juan Reservoir
Design, Build & Operate Scheme of Silangan Water System
Design & Construction of 5ML Reservoir in Banlat Road, Quezon City
1400mm DIP Pipelaying along Coastal Road (Package 1B)
Valve Exploration and Replacement or Insertion of Valves in Various Locations
Rehabilitation of Roosevelt Zone 2 and 3
Construction of the Stub-out Source for Balara Treatment Plant II
20MLD Maguey Reservoir and Pumping Station
Design and Construction of QC-Road QC - Road 5 Sewage Treatment Plant and Facilities (Project 6 STP)
MWCI-Design and Construction of 25ML Balara Reservoir
MWSI Proposed 900mm and 400mm Steel Pipe Installation and Gauging Point along United Nations Ave. and P. Romualdez Sr. St. Manila
MWSI Proposed 750mm and 400mm Steel Pipe Installation and Gauging Point along San Andres St. to Quirino Ave.
MWSI Reactivation and Rehabilitation of Algeciras Pumping Station and Reservoir
MWSI Pipe Replacement Project in Caloocan Zone C-10 (Package C10)
MWSI Pipelaying along Barangay Commonwealth, Quezon City, Sampaloc and Tondo
 1  2  >>  LAST 
HOME | NEWS | ABOUT US | ACTIVITIES | PROJECTS | CAREERS | SUPPLIER | CSR | INQUIRIES