Javascript must be enabled to use this form.

 
 
 
HOME
NEWS
ABOUT US
SERVICES
PROJECTS
CAREERS
SUPPLIER
CSR
INQUIRIES
 
First Balfour, Inc. Home

Design, Build & Operate Scheme of Silangan Water System


* FEATURED *
Customer: Manila Water Company, Inc.
Project Status: On-going
Date Awarded: September 10, 2009
Completion Date: February 28, 2011

 

The  project is an extension of the Modesta Water Supply Project, with the 5 ML Modesta reservoir as its source. From the proposed 5 ML Modesta Reservoir located in Brgy. Sto. Nino which will be constructed by another contractor, the Modesta–Silangan Water System Project will start with the construction of the 15 MLD Upper Modesta Pump Station (2 x 500 HP Pump sets) drawing water from the said 5 ML Modesta Reservoir.  The projec scope will also include the construction of the Proposed 5 ML Silangan Reservoir located in Brgy. Silangan, San Mateo and a transmission line 500mm Ř  that will connect to this reservoir . From the Silangan Reservoir, another Distribution Line with a minimum diameter of 300mm will be constructed traversing up to Monterey Hills Subdivision via De Los Santos Avenue.  Stub outs dedicated for those identified beneficiaries in the area will also be constructed and tapped along the Distribution Lines.




SILANGAN-073010-001
SILANGAN-073010-002
SILANGAN-073010-003
SILANGAN-073010-004
SILANGAN-073010-005
SILANGAN-073010-006
SILANGAN-073010-007
SILANGAN-073010-008
SILANGAN-073010-009
SILANGAN-073010-010


 [Go To List]
HOME | NEWS | ABOUT US | ACTIVITIES | PROJECTS | CAREERS | SUPPLIER | CSR | INQUIRIES